Brampton

Residential Structural Engineer in Brampton

Basement apartments, second units, walkouts and wall removals for Brampton homes, with sealed drawings for the City of Brampton.

3–7 days

Typical drawing turnaround

2,500+

Projects engineered

P.Eng.

Drawings your city will accept

What we engineer

Brampton has one of the highest numbers of second units in Ontario, and many homeowners are adding legal basement apartments. Those often need new openings, egress windows, walkouts or beam changes, all of which need engineered drawings.

Load-bearing wall removal

We confirm the load path, size the new beam in wood, LVL or steel, and design the posts and footings below it. Sealed permit drawings, support through the permit, and an optional site review during construction.

Additions & second storeys

Framing, foundations and connections for new space.

Underpinning & walkouts

Lowered basements, underpinning and new walkout openings.

Second & garden suites

Structural design for new suites, including fire separations and openings.

Decks & porches

Decks, porches and canopies designed to code.

Inspections & reports

Assessments for cracks, sagging floors, damage or a home purchase.

How it works

Step 01

Tell us about the project

Send photos, the address and what you want to change.

Step 02

Site visit

An engineer visits to measure and review the existing structure.

Step 03

Sealed drawings

Calculations and sealed drawings, typically within 3–7 business days.

Step 04

Permit support

We answer the city’s questions and help your contractor on site.

What to send us

Sending these with your request means a faster, more accurate quote.

Home address

Photos of the area you want to change

Any existing or architectural drawings

A short description of the work

Your contractor’s details, if you have one

Ready to start?

Use the quote form, or email your drawings and photos straight to office@kmgengineering.com. We’ll confirm the scope and send you a clear quote.

“Justin, Mudiwa, and the KMG team were professional, responsive, and helpful throughout the entire process… We appreciate their professionalism and look forward to working with KMG Engineering again on future projects.”

Kelvin Chatinyara

President, Savannahridge Construction Inc.

Common questions

Do I need an engineer for a legal basement apartment in Brampton?

If the work involves new openings, a walkout or changes to load-bearing walls or beams, yes. We provide the structural drawings for the permit.

Can you enlarge a basement window for egress?

Yes. We design the new opening and lintel in the foundation wall so the window can be enlarged safely.

Have a project in mind?

Tell us about your site and your plans. We’ll confirm the scope and send you a clear quote.

Create a free website with Framer, the website builder loved by startups, designers and agencies.